Uptime objectives¶
Power Supply¶
- What: Power supply to all systems
- Setup:
- Core systems are connected to UPS that last between 7-30 minutes
- Virtualisation systems are not (yet) fully connected to UPS
- Expected outages
Internal Network¶
- What: The connection between servers, routers and switches.
- Setup: All systems are connected twice internally, usually via fiber
- Expected outages
- Single switch outage: no outage, maybe short packet loss (LACP link detection might take some seconds)
- Double switch outage: full outage, manual replacement
- Uptime objectives
- 2019: >= 99.999%
- 2020: >= 99.9995%
- 2021: >= 99.9995%
L2 external Network¶
- What: the network between the different locations
- Setup:
- Provided by local (electricity) companies.
- No additional active equipment / same as internal network
- Expected outages
- 1 in 2018 that could be bridged by Wifi
- If an outage happens, it's long (digging through the cable)
- But it happens very rarely
- Mid term geo redundant lines planned
- Uptime objectives
- 2019: >= 99.99%
- 2020: >= 99.995%
- 2021: >= 99.995%
L3 external Network¶
- What: the external (uplink) networks
- Setup
- Currently one uplink by EDIG / HIAG
- Expected outages
- Based on 2018
- Partially unresponsive / unwilling to cooperate
- Multiple smaller, one bigger outage
- 2nd and 3rd line providers are evaluated / phased in
- Plan 2019 phase in 1 connection per DC + third at the hub
- Uptime objectives
- 2019: >= 99.9%
- 2020: >= 99.99%
- 2021: >= 99.995%
Routers¶
Servers¶
- What: Servers host VMs and in case of a defect VMs need to be restarted on a different server
Updated by Nico Schottelius almost 6 years ago · 1 revisions