Actions
Task #7247
closedOur switches in place8 should be moved to a different location / rack
Start date:
10/21/2019
Due date:
10/30/2019
% Done:
0%
Estimated time:
PM Check date:
Description
- Coordinate with Kilian Bäbler
- Visit place8 once before doing the actual move
- Checkout the UPS situation
- Verify that both switches are connected to the UPS
- Verify that the UPS can hold power for both switches
Step¶
- First verify that the switches are both configured the same
- First move the unused switch / the one that does not bridge the two data centers
- Then move the cables to the moved switch (-> short interrupt between the data centers)
- Have 1 or 2 notebooks open, testing the connection
- Verify that connection is back when plugging back in
- Then move the second switch (which is now the backup switch
Should be finished by mid next week.
Updated by Nico Schottelius about 5 years ago
- Description updated (diff)
- Due date set to 10/30/2019
Updated by Samuel Hailu about 4 years ago
- Status changed from New to Resolved
- Assignee changed from Samuel Hailu to Nico Schottelius
Updated by Nico Schottelius about 4 years ago
- Status changed from Resolved to Closed
redmine@ungleich.ch writes:
Actions